+7 964 362-30-50
hello@adinsight.ru

brochure design construction company Stroymontazh

The design of the building covers companies

cover Development, booklet creation. shield driving, civil works, network engineering.

brochure design construction company Stroymontazh Design construction company brochure

Design construction company brochure

brochure design construction company Stroymontazh

The cost of the layout design, concept, sketch in St. Petersburg and Moscow. Creating a project in St. Petersburg.

price: from 20 000p. time: from 5 days

Examples of our work: form style | branding | brendbuk

About "Stroymontazh" – is a young developing construction company, with more than 400 specialists, capable of performing a wide range of underground (including the use of special methods) and civil engineering works of any complexity, for all the needs and requirements.

Our company is actively working with customers such as the State Unitary Enterprise "Moskollektor", ZAO "UKS IKS and D", AO "Moskapstroj", OOO "Holding Vesta-SF", GK «Plane», etc..

The use of "Stroymontazh" Ltd. advanced technologies, latest machinery can significantly reduce construction time, improve the quality of the work undertaken, and perform work of any complexity in any conditions.
Today "Stroymontazh" LLC has experienced specialists, powerful material and technical base and construction technology. The property company has two tunnel boring machine with a diameter 3,25m and 3,15m; Two tunnel boring machine with a diameter 3.9 m, and 4,1m; a tunnel boring machine with a diameter of 2m, as well as a tunnel boring machine with a diameter of 2m long-term lease. for the period 2015 – 2018 g. Travel more 2000 p.m. schytovoy sinking, renovated and equipped with engineering systems more 2500 p.m. underground reservoirs for utilities.

Capital construction:

Construction and commissioning of the municipal order of the object: cable collector from PS "Presnya", order №5795-14-00 (2016 – 2018 gg.)
Construction works for the collector in the area 64km MKAD shield driving method for the construction of heat supply network diameter 2 Du h = 700mm
Construction of the cable collector VK4 to VK6a near the Volga Boulevard (SS "Novo-Kuzminki"), order number 3849-13 (2015 – 2016 gg.)
Construction of the reservoir discharge 20kV from Substation 220 kV "Mnevniki". Stage 1. Portion of the chamber K3, through chamber K4, K7 to backup the current collector chamber under p. Moscow. (2016 – 2017 gg.)
Relaying pressure piping DN = 1400mm, №4, 5 by CND "Lublin" (ul.Donetskaya)
Kozhukhovskaya line item. "Aviamotor" – Article. "Nekrasovka". The plot of "Nizhny Novgorod street" station to "Nekrasovka" station (2018 - 2019gg.)
An object: Construction of control tower for cable collector from PS "Pervmomayskaya".

Cable collector from the SS "Belarus"

Construction of an underground cable collector shield Herrenknecht complex
- Stage 1 ", order №5796-14-00. (2016 – 2018 gg.);
- Penetration shield complex Dn = 3,25 m: length - 1088,0 m;
- Clear the way: laying monolithic collector 2,1h2,1 m 24,0 m for connection to a common collector section 2,9h3,1 m;
- Shtolnevaya manifold gasket with a shield length of pipe 19,5 m;
- The device grouting piles in the bottom, pits on the perimeter, mines, as well as the I / O panel-complex;
- fencing apparatus excavation method diaphragm wall;
- Relaying aqueduct open cast ductile iron d300mm and a closed manner by horizontal screw auger drilling using Fitting;
- Shifting the sewer network open way of ductile iron pipe diameter = 200, and reconstruction of sewage by the "Pnevmoproboynik";
- Relaying networks (FGUP «RS to»);
- Shifting of electrical networks of JSC "OEK", PAO "MOESK".

Construction Conduit in the territory of the administrative and business center in the village Kommunarka

Construction of an underground reservoir for utilities (3,0h3,5(h)m) open way, total length 1002,5 m.
- device 14 monolithic reinforced concrete chambers;
- Production of cast reinforced concrete poles for the heating system fixed in the collector;
- Device shelves for cables local needs;
- Equipment OPS collector systems, AKM, tWO, BCC, ventilation and water abstraction.

Objects of reconstruction:

Complex reconstruction of the collector "Zyuzin" stage 2 including waterproofing, strengthening and plugging the bottom, Strengthening of building structures, installation of cable and technological metal, technical re-equipment of engineering systems OPS, tWO, AKM, OB, PDE L = 1930m. (2016 – 2018 gg.)
Complex reconstruction of the collector "Nebo-science", including waterproofing, strengthening and plugging the bottom, Strengthening of building structures, installation of cable and technological metal, L=4054м. (2016 – 2018 gg.)
Complex reconstruction of the collector "Chertanovo-1" PK0-PK287 including waterproofing, strengthening and plugging the bottom, Strengthening of building structures, installation of cable and technological metal, technical re-equipment of engineering systems OPS, tWO, AKM, OB, EOM (2018 – 2019 gg.)